- Responsible for MV and LV containerized substation package.
- Responsible HV cables, termination kits and its routing design
- Responsible for Power system studies for the entire plant network along with Grid interface. Load flow, SC, harmonics, Motor starting, relay coordination & Transient studies.
- Developing specification, datasheets and ITPs for above jobs handling the supplier selection, TBT and PO execution responsible.
- Field area model and layout review
- Handling the remote inspections for LV & MV substations, HV cables and HV cable terminations. Inspected completed installations to observe operations and verify conformance to design and equipment specifications.
- Implemented and approved MCC-DCS control interface procedure and its IFATs. Implemented the first time safety trip interface via serial interface for the project.
- Mentored junior engineers and new hires to better improve competency and efficiency of all staff.