A highly skilled Land Surveyor with 8 years of experience across a range of construction projects, including roads, buildings, canals, dams, and high-rise structures. Proficient in all aspects of survey work, with specialized expertise in high-rise buildings, where responsibilities include setting out columns, core walls, staircases, and grid lines, as well as marking levels for structural and finishing stages. Experienced in preparing and reviewing shop and as-built drawings, conducting topographic and static surveys, and coordinating with consultants to ensure precision. Adept at managing complex tasks such as setting out control points, marking block work, and calculating earthwork volumes, with a reputation for meticulous attention to detail and efficient project execution. 

Key Skills

Total Station
AutoCAD Design
Auto Level
DGPS
Drone Survey

Professional Experience

Apr 2021
Present
Senior Surveyor
Aparna Constructions Hyderabad, IN

  • Project Management: Managed MIVAN shuttering operations for Yellow Bells and Marigold sites, ensuring timely and accurate execution of all construction tasks.
  • Quantity and Excavation Management: Oversaw the calculation and management of material quantities, excavation levels, and ensured precise implementation in line with project specifications.
  • Grid and Contour Mapping: Developed and managed grid and contour maps to guide construction processes, providing a clear framework for site layout and elevation.
  • Column and MIVAN Markings: Conducted precise markings for all columns and MIVAN shuttering, ensuring structural integrity and alignment with design plans.
  • Drawing Design and Confirmation: Expertly designed construction drawings, and successfully obtained drawing confirmations from clients, ensuring all plans met project requirements and client expectations.
  • AutoCAD Expertise: Utilized advanced AutoCAD skills to create, modify, and finalize technical drawings, ensuring accuracy and adherence to project specifications.
  • Open Surveys: Led open surveys across the construction sites to verify and adjust levels, ensuring the accuracy of all measurements and alignment with project goals.
  • Team Leadership: Directed a team of surveyors and construction workers, coordinating activities to achieve project milestones efficiently and to a high standard.
  • Quality Control: Implemented stringent quality control measures, verifying that all MIVAN shuttering and related construction activities met the highest industry standards.
  • Stakeholder Collaboration: Worked closely with engineers, architects, and other stakeholders to ensure that all survey and construction activities aligned with overall project objectives.

 
Jul 2016
Mar 2021
Land Surveyor
Tata Visakhapatnam, IN

  • Project Leadership: Led a team of 15 surveyors on the APTIDCO Vizag project, overseeing all surveying activities and ensuring precision in marking and setting out.
  • Topographic Survey and Contours: Conducted a detailed topographic survey, created accurate contours and grids, and provided essential land data that informed the project's design and planning.
  • Excavation Quantity Calculation: Accurately calculated excavation quantities and provided this critical information to the contractor, ensuring efficient resource allocation and project execution.
  • Google Earth Mapping: Utilized Google Earth to create detailed maps, enhancing the visualization and planning process for the project and providing a clear geographical context for decision-making.
  • Drawing and Coordinate Management: Finalized all building drawings and confirmed coordinates, ensuring alignment with project specifications and maintaining accuracy throughout the construction process.
  • Survey Team Management: As the survey team head, coordinated the efforts of the entire survey team, ensuring efficient workflow and high-quality results across various project phases.
  • Quality Assurance: Responsible for the confirmation of building drawings and coordinates, ensuring that all surveying activities met the project's stringent quality standards.
  • Stakeholder Coordination: Worked closely with project stakeholders, including engineers and architects, to provide critical survey data that supported the successful execution of the project.

 

Education

Jun 2013
Jun 2016
Diploma in Sankethika Polytechnic College
State

Achievements

Successful Project Completion
 Efficiently managed MIVAN shuttering operations for Yellow Bells and Marigold sites, contributing to the successful completion of high-profile residential projects on time and within budget. 
Topographic Survey Accuracy
 Conducted a comprehensive topographic survey with high precision, which provided critical data for excavation and site planning, contributing to successful project outcomes. 

Hobbies & Interests

  • Gymming

Languages

English
(Fluent)
Hindi
(Fluent)
Telugu
(Native)

Get in touch with Gowtham