- 8 MTPA Crushing, Washing & Screening Plant, Khondbond Iron Ore Mines, Tata Steel Limited (November,2017 – June,2020)
- 2 x 800 MW Telangana Super Thermal Power Plant, NTPC-Ramagundam (June,2020- till date).
i) Installation of HT & LT Switch Gears, Transformers, UPS, Motors, Cables, Auxiliary as well as Numerical Relays, FDA.
ii) Testing & Commissioning of Dry type & oil type(up to 130MVA,400kV/11kV) Transformer with Busducts & Shunt Reactor (up to 125MV Ar, 400kV)
iii) Tan-delta, SFRA testing of transformer and bushings.
iv) Commissioning of 25kVA,30kVA & 200kVA UPS.
v) Commissioning of heavy-duty battery bank & charger (134 VDC).
vi) Testing & Commissioning of HT Switch Gear (11kV,6.6kV,3.3kV) and 415V PCC, IMCC, UMCC
vii) Testing & Commissioning of LT & HT motors (up to 3.9MW, 11kV)